Irrigation Services

The following information is to assist you, our customer-owners. The following needs to be provided:

  • A plot plan showing your preferred fencing and transformer location(s).  PUD will work out the actual transformer location together as we finalize the engineering plans.
  • Service voltages desired.
  • Total connected load in kW, broken down into requirements for Pump motors (along with their size), etc.
  • Estimated demand in kW.
  • Projected growth in electrical power requirements in kW in the next few years.
  • Size and type of service wire to be installed.

Franklin PUD STRONGLY recommends that you install "Phase Failure Protection" on your 3-phase service equipment to protect your pump motors.

Irrigation Services